Construction Loans
A construction loan we closed recently, in Ventura County: $2,590,000, ground-up multifamily, 70% of ARV, first trust deed, one year interest-only, underwritten on bank statements. That is a fairly typical file for us, and it is the kind of deal a lot of banks will not touch right now.
We fund ground-up construction nationwide. Spec homes, multifamily, industrial, mixed-use, self-storage, subdivisions. We have also picked up our share of construction completion deals, stalled projects that need a lender willing to underwrite a half-built asset. We recently funded an office construction completion, which is not a sentence most lenders can write.
How the money flows
An initial advance funds the land or your existing basis. The construction budget sits in a holdback and comes out in draws as work gets done and inspected. We set the budget and contingency up front, together, so draw requests do not turn into arguments later. Your crews should never be waiting on a lender.
You pay interest only on what has actually been drawn, not on the full commitment. A three million dollar loan where one million has funded costs you interest on one million. That is worth understanding when you compare quotes, because a slightly higher rate on a faster-funding lender often costs less over the build than a cheap rate that dribbles money out.
Terms, roughly
$1M to $100M. Up to 80%+ of cost or ARV depending on experience and the leverage point, 85%+ with a stretch senior. Interest-only through the build, usually 12 to 24 months with extensions available. PG and non-PG structures.
Where the leverage lands depends less on the property than on you. A sponsor on their eighth ground-up build gets a different number than a first-timer, on the same dirt, with the same plans. That is not a judgment about anybody. It is just what the loss history says.
What we actually underwrite
Four things, roughly in this order.
The budget. Line by line, with a contingency that survives contact with reality. A budget with no contingency is not a budget, it is a wish. We would rather argue about the number before closing than watch you run out of money in month nine.
The general contractor. Licensed, bonded where it matters, and with a resume that looks like the project in front of us. A great GC on the wrong asset class is still the wrong GC.
The schedule. Not the optimistic one. Permits, long-lead items, inspection windows, and the weeks that always disappear between framing and drywall.
The exit. Sale, refinance, or lease-up into permanent debt. Construction loans are the most exit-dependent product we write, because the collateral is worth the least on the day the money is most at risk.
The draw process in practice
You submit a draw request against completed work. An inspector confirms the work is in place. Funds release. Then it happens again, usually monthly, sometimes more often on a fast build.
The friction almost always comes from the same places. Lien waivers that did not get collected. A draw request for work that is ordered but not installed. A budget line that was optimistic in March and is now short. None of that is exotic, and all of it is avoidable if the budget was built honestly at the start.
Talk to us before you submit a draw you are unsure about. A phone call takes ten minutes. A rejected draw costs you a cycle.
Completion loans, when someone else stopped funding
This is a specific and unglamorous corner of the business, and we do more of it than most.
A project is sixty percent built. The original lender has stopped funding, or failed, or decided the asset class is no longer to their taste. Subs are threatening to walk. Mechanics liens are starting to appear. The building itself is fine. The capital behind it is not.
Underwriting a half-built asset is harder than underwriting dirt, because we have to form a view on what was already done and what it will cost to finish it properly. That takes a site visit, a hard look at the remaining budget, and an honest conversation about the schedule. It is doable. It is just not fast if you wait too long.
Call before the liens pile up. Every week of delay makes the file more expensive to fix.
What we need in order to quote
The address and what you are building. Your basis in the land, or the purchase price if you are still acquiring. The full construction budget. Plans, and where you stand on permits. Your GC and their background. The exit, and roughly when. What you have built before.
If permits are not pulled yet, say so. It is not a dealbreaker, it changes the structure. Lenders find out eventually, and the ones who find out at closing tend to reprice.
Where construction debt goes wrong
Three ways, and they are always the same three.
The budget was light. Not fraudulently, just optimistically, and now there is no contingency left and the project is eighty percent done. This is the most common failure by a wide margin.
The schedule slipped past the loan term. Extensions exist for exactly this, and they are routine when the project is genuinely progressing. Ask early.
The exit assumed a market that moved. If your pro forma needs a sale price that only worked eighteen months ago, we would rather stress that number with you now than discover it together at maturity.
Property types we build
Spec homes and multifamily, industrial, mixed-use, self-storage, retail, and subdivisions. Entitled land and subdivision takedowns. Build-to-rent and townhome communities. Senior housing and student housing on a case by case basis.
Business purpose only. If the plan is for someone to live in the finished product as their primary residence, this is the wrong product and we are the wrong lender.
Questions we get a lot
First project. Will anyone lend to me?
Experience buys leverage and price, but a first-timer with a strong GC and real equity gets a look here.
My current construction lender stopped funding draws. Can you take it over?
This is exactly what completion lending is for. Call us before the mechanics liens pile up.
Do you lend on land?
Entitled land and subdivision takedowns, yes.
Can I act as my own general contractor?
Sometimes, if you hold the license and have the track record to match. Owner-builder files get more scrutiny on the schedule, not less.
What happens when the build finishes?
You sell, or you refinance. If you are holding it as a rental, a DSCR loan is usually the takeout. If it is a stabilizing apartment deal, a bridge loan can carry it to agency debt.
Is the interest reserve included?
Often, and we will tell you plainly whether yours is. An interest reserve keeps you from feeding the loan out of pocket during a build with no income.
What if my costs come in over budget?
Talk to us the month it becomes visible, not the month you run out. Contingency exists for this, and there are usually structures available if the project is otherwise sound.
Do you need the equity in first?
Generally yes. Lenders fund behind sponsor equity, not in front of it.
Have a deal to run by us? Call (747) 724-5890 or apply online. We read every submission and give straight answers fast. Westgate Capital Ventures, Inc. | 1849 Sawtelle Blvd, Los Angeles, CA 90025 | CA DRE# 02201195
Westgate Capital Ventures, Inc. originates and brokers commercial, business-purpose loans only. Not for personal, family, or household use. This is not a commitment to lend. All loans subject to underwriting and credit approval. Availability may be limited in certain states.